Animate Studios

Location 
Preston

Main Contractor
Eric Wright Group

Project
£45m flagship leisure destination in Preston city centre.

Contract

  • Water and gas connections

Delivery

  • The site presented significant elevation challenges
  • Water and gas connections came in from opposite ends of the development area
  • City centre working, including a water connection within a live bus stop
  • Close working with our Client and M&E contractor throughout to correctly size internal pipework.

Lovell House
412 The Quadrant, Warrington
Cheshire WA3 6FW
Call: 01925 825 770

Quick enquiry

X

Accreditations

© Copyright BGS Utilities 2025. Privacy policy | Modern Slavery | Anti Bribery